Create an Account

Platform Lifts


With a 6, 7 or 8 tons lifting capacity, platform lifts (so called lifting tables) have to be used to support, to lift up, to lift down and to move horizontally and laterally a bogie during maintenance operations.

Sku: SEFAC-F003

With a 6, 7 or 8 tons lifting capacity, platform lifts (so called lifting tables) have to be used to support, to lift up, to lift down and to move horizontally and laterally a bogie during maintenance operations.

Lifting table - Tramway Reims - SEFAC

Table dépose bogies - SEFAC

Technical Specification

The platform lifts move directly on the rails inside the workshop.
This displacement can be either manual or motorized. In this case, the operator pilots the lift using a wired remote control and/or a wireless remote control (available as an option).
The lifting table is delivered with a ball transfer plate as standard enabling an easy move of the bogie.

Feature TDB06

Capacity t 6
Length mm 3 500
Width mm 1 900
Height of the platform
closed
open
locked position
mm
mm
mm
660
1 650
1 425
Gap with ground mm 100
Lateral transfer mm +/- 25
Weight
Empty
Loaded
kg
kg
2 560
8 560
Lifting speed Up s 30
Lifting speed Down s 35
Space between rails
upper table
single slanged
mm
mm
1 435
1 435
Hole in the table mm 900 x 1 700
Time meter standard
Motorization Kit
Battery autonomy
Horizontal displacement low speed
Horizontal displacement high speed
h
m/min
m/min
option
2
2
15
Back to Top